Guide for Miami 40-Year Recertification - Markone contractors (2024)

At MarkOne Contractors, we specialize in guiding property owners through the intricacies of 40-year recertifications, encompassing thorough inspections of both structural and electrical elements. Whether you’ve received a notice or are proactively considering this process for your property in Miami-Dade County, our comprehensive blog serves as your go-to resource. We offer valuable insights into the step-by-step procedures for a seamless 40-year recertification, tailored to meet the specific requirements of Miami’s diverse neighborhoods. Trust us to demystify the intricacies of the recertification process, ensuring your property aligns with regulatory standards and stands as a beacon of safety and compliance in the vibrant landscape of Miami real estate.

Guide for Miami 40-Year Recertification - Markone contractors (1)

What's the Deal with Miami's 40-Year Recertification?

In Miami Dade County, buildings that have stood for at least 40 years are required to undergo a special inspection. According to the Miami-Dade County Department of Regulatory and Economic Resources, it’s all part of ensuring safety. Here’s the scoop:

  • Any building that’s hit the 40-year mark needs a checkup.
  • This checkup covers both the building’s structure and electrical systems.

Take action now – Initiate your 40-Year Recertification!

Ensure your success, renew your certification today!

(561)810-2370

Guide for Miami 40-Year Recertification - Markone contractors (2)

  • You’ll need to provide a Recertification Report to the Building Official.
  • This report must be prepared by a certified Florida engineer or architect.
  • They’ll confirm that the building is still safe to use.
  • The engineer or architect has to sign and seal each page of the report.
  • If there’s more than one building on your property, you’ll need a site plan or survey.
  • This helps to identify the building that’s up for the 40-Year Recertification.

It’s all about keeping things safe and sound in Miami!

Here is a sample letter that Miami Dade issues properties when they turn 40 years of age or every 10 years thereafter.

Who Gets a Free Pass on Miami's 40-Year Recertification?

Good news! Some properties are exempt from the 40-year recertification process in Miami. You don’t have to worry about it if your property falls into any of these categories:

  1. Buildings with 10 or fewer occupants.
  2. Buildings that are 2,000 square feet or smaller.
  3. Duplexes (two-unit buildings).
  4. Single-family homes.

Curious About Past 40-Year Recertification Cases in Miami?

If you own or manage a property in Miami-Dade, you can check out the history of 40-year recertifications. Miami-Dade has a portal where you can look up cases dating back to May 1996. This service covers properties in the Department of Regulatory and Economic Resources’ jurisdiction, which includes Miami Dade County. You can search by folio, property address, property owner name, or case number. It’s a handy tool to keep tabs on past recertification cases.

Guide for Miami 40-Year Recertification - Markone contractors (4)

Is Your Building Behind on Its 40-Year Recertification in Miami?

If you’ve missed the deadlines for your 40-year recertification, don’t worry. You won’t be able to apply or submit documents online, but there’s a solution:

You should head over to the Unsafe Structures department at the Miami-Dade County Building Department in person.

Additionally, it’s a good idea to get in touch with your local city to check if there are any extra requirements you need to meet for the building recertification program. Below, you’ll find a directory listing each city in Miami along with their respective department that handles 40-year recertifications.

Running Out of Time for Miami's 40-Year Recertification?

If you need more time to meet the 40-year recertification deadline, you can ask for an extension. Here’s what you need to know:

  • Your request for an extension must be made before the recertification due date.
  • If your extension is approved, there’s a $500 fee.
  • Building managers and property owners can request an extension by sending an email to unsafestructure@miamigov.com. Be sure to include your property’s address.
  • Once you send in your request, you should hear back within four weeks.
  • It’s also a good idea to check with your city to see if they have any additional requirements.

This way, you can get the extra time you need to ensure your building is up to code.

Thinking About Repairs Before Your Inspection?

If you’re considering repairs before an inspection, there are some important steps to follow:

  • Make sure to check Miami’s permitting page for the latest info. It might be under construction, so be patient.
  • If the website isn’t available, you can call (305) 416-1177 or email unsafestructures@miamigov.com for guidance from the city.

Getting a 40-Year Recertification Inspection in Miami

When it comes to the 40-year recertification, it must be carried out by a licensed professional engineer. Miami Dade County provides some sample inspection forms as examples. These forms show the key checkpoints that need to be covered in the 40-year recertification report. You can find them here:

Once the inspection is done, the engineer will provide a report. This report will include a cover letter, and it will be signed, sealed, and dated. If there are any recommended repairs, they will be mentioned in the report.

It’s all about making sure your building is in good shape!

Act now for peace of mind – Schedule your 40-Year Recertification!

Renew with pride! Act now for your 40-Year Recertification and stay ahead in the game.

(561)810-2370

Guide for Miami 40-Year Recertification - Markone contractors (5)

Submitting Your 40-Year Recertification Reports Made Easy

Miami-Dade County has recently launched an online portal for submitting the required inspection reports. Before you dive in, make sure to go through this section carefully. They’ve got some specific rules and naming conventions to follow, so your report doesn’t face delays during the review. Here are the steps to guide you through the process:

  • The recertification report should be saved as a PDF.
  • Use the City of Miami Standard Naming Conventions when saving your files, as follows:
    • 40-S: For the Structural Report.
    • 40-E: For the Electrical Report. It should include the illumination letter, and you must indicate whether it “meets” or “does not meet” the standards. If you have a cover letter for the electrical report, label it as 40-C.
    • 40-CE: If the electrical report is prepared by a different professional, add this as a separate PDF for the electrical cover letter.
    • 40-C: For the Cover Letter.
    • 40-PHO: For any Photos.

Set up an account in iBuild,

Upon completing these steps, you will receive an email from ePlan/ProjectDox, guiding you to log in. Your account will be linked to the prior application you submitted. Follow these steps to submit your recertification report.

Here’s how to do it:

Step 1: Register

Step 2: Begin the Application Process

  • Start the Building Permit Application.
  • Enter your address and confirm the owner’s address.
  • Select Architect/Engineer.
  • If your building is due for recertification (you should have received a letter about this), you’ll see an option for “Apply for 40/50 Recertification.” If your building isn’t due for recertification, this option won’t appear. Note: If your building is overdue for recertification (built in 1982, 1983, or 1984), you can’t complete this process online.
  • The system will prompt you to upload documents. Choose “YES” and complete the remaining steps. Make sure to use the same email for the person who will upload the reports and documents throughout the application process. This person will receive the link for uploading documents, and no one else will receive this link.
  • Download the invoice and make any required upfront payments in iBuild. Your BD number is the same as your process number.

With these steps, you’ll be on your way to submitting your 40-year recertification reports hassle-free!

Submitting Your Documents

Once you’ve followed the previous steps, you’ll get an email from ePlan/ProjectDox with instructions to log in. Your account will be linked to the application you submitted. Here’s how to submit your recertification report:

  1. Choose “Manage Your Plan Review.”
  2. Select the project number/plan number.
  3. In the documents section, pick either “Applicant Upload Task,” “Applicant Resubmit Task,” or “Corrections.”
  4. Follow the instructions and upload the necessary documents. Make sure they have the right names.
  5. Complete the task and submit it to the City of Miami.

Before you send anything online, it’s a good idea to check with your local city using the directory below. Make sure they’re on board with this electronic process and see if any additional requirements are needed.

FAQs

The 40-Year Recertification is a safety measure enforced in Miami-Dade County. It ensures that buildings over 40 years old are structurally sound and electrically safe.

Buildings with 10 or fewer occupants, properties that are 2,000 square feet or smaller, duplexes, and single-family homes are exempt from the 40-Year Recertification.

Miami-Dade County provides a portal where you can search for previous recertification cases dating back to May 1996. You can search by folio, property address, property owner name, or case number.

If you’ve missed the deadline, you won’t be able to apply or submit documents online. Visit the Unsafe Structures department at the Miami-Dade County Building Department in person. Also, check with your local city for any additional requirements.

Yes, you can request an extension, but it must be done before the recertification due date. If approved, there is a $500 fee. Send an email to unsafestructure@miamigov.com with your property’s address to request an extension. It usually takes about four weeks to get a response.

Make sure to follow the proper permitting procedures by checking Miami’s permitting page for the latest information. If the website is unavailable, you can call (305) 416-1177 or email unsafestructures@miamigov.com for guidance from the city.

The 40-Year Recertification must be conducted by a licensed professional engineer. You can find sample inspection forms on the Miami Dade County website. The inspection covers both structural and electrical components, and the engineer will provide a report with recommendations, if applicable.

  • After registering and starting the application process in iBuild, follow these steps:
  • Select “Manage Your Plan Review.”
  • Choose the project number/plan number.
  • In the “Documents” section, pick “Applicant Upload Task,” “Applicant Resubmit Task,” or “Corrections.”
  • Follow the instructions to upload your documents with the correct naming conventions.
  • Complete the task and submit it to the City of Miami.

Make sure to use the City of Miami Standard Naming Conventions for your documents. This helps prevent delays during the review process.

It’s advisable to check with your local city to ensure they support the electronic submission process and to verify if they have any additional requirements.

Conclusion

The 40-Year Recertification process in Miami serves as a vital safeguard for the structural and electrical integrity of buildings, prioritizing safety and longevity. Property owners and managers in Miami-Dade County can navigate this process with confidence, thanks to the wealth of information provided in this guide. From understanding the necessity of recertification to seeking exemptions and extensions, we’ve covered it all. With accessible online submission options and expert insights, compliance is made more manageable. We encourage you to use the resources and support available to ensure that your building remains safe and sound for the years to come, contributing to the well-being of Miami’s vibrant community.

SEE WHAT OUR CUSTOMERS ARE SAYING

I recently went through the 40-year Recertification process with MarkOne Contractors, and I am extremely pleased with the level of professionalism and efficiency they exhibited. The team at MarkOne Contractors made the entire recertification process seamless and stress-free. Their attention to detail and timely communication ensured that I was well-informed at every step. I highly recommend MarkOne Contractors for anyone in need of recertification services. Thank you for your exceptional service!

John Doe

I want to express my gratitude to MarkOne Contractors for their outstanding assistance during my 40-Year Recertification. The expertise and knowledge demonstrated by their team were truly impressive. The entire process was handled with precision and transparency. I appreciated their commitment to meeting deadlines and providing clear explanations for any queries I had. MarkOne Contractors is undoubtedly a reliable partner for recertification needs, and I will be recommending their services to my colleagues and friends.

Jane Smith

recently engaged MarkOne Contractors for my 40-Year Recertification, and the experience exceeded my expectations. The team at MarkOne Contractors displayed a high level of professionalism, guiding me through each step of the process with patience and expertise. Their attention to detail and commitment to customer satisfaction were evident throughout. I am grateful for the seamless recertification experience provided by MarkOne Contractors and would not hesitate to recommend their services to others.

Robert Johnson

Previous

Next

Get A Free Quote
Guide for Miami 40-Year Recertification - Markone contractors (2024)

References

Top Articles
OSRS 1-99 Complete Cooking Guide - OSRS Guide
OSRS Cooking Guide - Training 1-99 Fast (F2P & P2P Methods)
Bad Moms 123Movies
Camping World Of New River
Nehemiah 6 Kjv
Wordscapes Level 5130
Champion Our Cause Wow
Abga Gestation Calculator
Puss In Boots: The Last Wish Showtimes Near Fox Berkshire
Ups Drop Off Newton Ks
Nosetf
Abcm Corp Training Reliaslearning
New Orleans Pelicans News, Scores, Status, Schedule - NBA
911 Active Calls Caddo
Badddae
Craigslist Com Humboldt
Cookie Clicker The Advanced Method
Megan Thee Stallion, Torrey Craig Seemingly Confirm Relationship With First Public Outing
Inloggen bij AH Sam - E-Overheid
Rimworld Prison Break
Publix In San Antonio Texas
Linktree Teentinyangel
Tani Ahrefs
2022 NFL Predictions
Forest Haven Asylum Stabbing 2017
Watch My Best Friend's Exorcism Online Free
Act3: Walkthrough | Divinity Original Sin 2 Wiki
Hyvee Workday
Charlotte North Carolina Craigslist Pets
Parent Portal Support | Hamilton-Wentworth District School Board
Biopark Prices
Societe Europeenne De Developpement Du Financement
Drury Plaza Hotel New Orleans
New R-Link system and now issues creating R-Link store account.
Kate Spade Outlet Altoona
Mesmerized Nyt Crossword
Osrs Desert Heat
Unfall mit Ikarus C42: Gefangen in der Umkehr-Falle
Hobby Lobby Locations Near Me
cGMP vs GMP: What's the Difference? | Ascendia Pharma
R/Moissanite
Bfri Forum
Lewisburg Tn Jail Mugshots
German American Bank Owenton Ky
Kieaira.boo
How To Get Genji Cute Spray
Lesson 2 Homework 4.1 Answer Key
Craigslist Antelope Valley General For Sale
Zachary Zulock Linkedin
Henry Ford Connect Email
Bbw Chan Lmbb
Latest Posts
Article information

Author: Msgr. Refugio Daniel

Last Updated:

Views: 6529

Rating: 4.3 / 5 (74 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Msgr. Refugio Daniel

Birthday: 1999-09-15

Address: 8416 Beatty Center, Derekfort, VA 72092-0500

Phone: +6838967160603

Job: Mining Executive

Hobby: Woodworking, Knitting, Fishing, Coffee roasting, Kayaking, Horseback riding, Kite flying

Introduction: My name is Msgr. Refugio Daniel, I am a fine, precious, encouraging, calm, glamorous, vivacious, friendly person who loves writing and wants to share my knowledge and understanding with you.